Project summary
The expansion includes the following changes:
- Extension of mining for 100 years
- Change in technique from mechanical (digging) of sand and gravel to drilling, blasting, and crushing hard rock
- Increase in depth of quarry to 600 feet below ground surface
For context as to the scale of 600 feet, we identified the San Francisco high rise depicted here. Located at 50 Fremont Center, the building reaches 43 stories into the San Francisco skyline and is 600 feet tall. If the CEMEX Rockfield Expansion Project moves forward, a hole deep enough to fit the entirety of 50 Fremont Center will scar the San Joaquin River bottom.
WHAT YOU CAN DO NOW
The Final EIR was released on September 25, 2026. The next steps in the process include a Planning Commission hearing on October 8, and then a likely appeal to the Board of Supervisors. We will update this site with the results of the first hearing and date of the Board of Supervisor’s meeting when they become available.
You can share your concerns about the project with the Fresno County Board of Supervisors. Information about the Fresno County Board is available here.
Use the links below to download the Parkway’s comments on the FEIR
Human Impacts
Dust, noise, groundwater depletion, groundwater contamination, air pollution, road congestion, these are just a few of the impacts identified in the EIR.
Wildlife Impacts
Disturbance to nesting birds including protected bald eagles and Swainson’s hawks; vibrations affecting fish in the San Joaquin River.

California Department of Fish and Wildlife Comments:
“CDFW is concerned that the duration of the Project, coupled with the complexity of the Project impacts, which includes blasting and excavation of bedrock down to approximately 600 feet, and uncertainty in climatic conditions due to climate change over the next 100 years, will result in significant unanalyzed direct and indirect impacts to biological resources beyond baseline conditions.”
Quote from CDFW comments on DEIR

City of Fresno comments:
“The project description in the NOP also fails to adequately describe the true expansive
nature of the Project”
Quote from comments on DEIR

Friant Water Authority Comments:
“The San Joaquin River is declared to be a “fully appropriated stream system” by the California State Water Resources Control Board. Any increase in water seepage from the San Joaquin River directly impacts the water supply of the water users of the Friant Division, which get water from the San Joaquin River, the Friant-Kern Canal, and from Millerton Reservoir.”
Quote from comments on DEIR